Guzu Machinery GZT Series Non-Blocking Self Priming Trash Pump


Guzu Machinery GZT series non-blocking self priming trash pump produced by our company introduces the new technology and technology from the United States. This product overcomes the shortcomings inherent in the traditional submersible sewage pump and engine driven trash pump, and has the characteristics of novel structure and reliable performance. Its battleship-style shape is the first in China; its unique oil-lubricated mechanical seal structure, non-blocking blades, replaceable liners, easy-to-maintain design and advanced BAUER devices make this series the standard for a new generation of self priming sewage pump. model. A very large vortex chamber plays an important role in the pump. It can perform efficient draining operations without the need to install a check valve on the inlet and outlet water pipes when the pump is fully operational. This product can be widely used in municipal sewage. Industrial wastewater treatment engineering and various wastewater grading and centralized treatment systems for conveying liquids with mild corrosion or containing large amounts of solid particles. The basic material of the pump is gray cast iron, and the impeller is made of ductile iron.

GZT series wet prime pump is divided into eight specifications from 50-350. The performance range is:
The flow rate is 10-1500M3/H,

The head is 10-68m, which can meet the various needs of users by cutting the outer diameter of the impeller, changing the speed and the combination of pumps of different specifications.

Safety considerations

1. Be aware of this manual before disassembling the pump for inspection and maintenance. Check the temperature of the pump before attempting to open any cover, plate or bolt. If the pump is overheated, try to cool it. Do not remove it from the heat pump.

The lower cover, the pipe joint and the accessories prevent the high pressure in the pump from attempting to push the parts out and hurt the person, and then operate the pump after cooling.

2. Because the company does not have any motor materials, it can not control the performance of the motor. Please check the motor accessories carefully before starting the machine.

3. 6 inch trash pump can only be used to transport industrial wastewater, mud or slurry containing a lot of solid particles with mild corrosion, and can not transport volatile, strong corrosion and flammable media, otherwise it will be crisis equipment and the safety of person.

4. Do not close the valve for a long time, otherwise it will damage the parts and cause internal fluid boiling, pressure rise, pump body rupture or explosion serious consequences.

5. Use lifting equipment to lift and move the water pump unit, and disconnect the inlet and outlet pipes before lifting.
6. A protective cover must be added to the outside of the exposed rotating parts to cause injury.

7. Drain the liquid in the pump before performing maintenance on the pump.

Run

l. Self-priming

GZT series pumps are self-priming centrifugal pumps. It is strictly forbidden to start running in the pump chamber without water! Water shortage is not only unable to self-prime, but also destroys mechanical seals due to dry grinding, mechanical seal work

The temperature must not be higher than 80 °C. Water must be added to the pump body under the following conditions:

1) before the first use;

2) The pump has been used for a long time;

3) The liquid in the pump is evaporated.

The water injection hole is located at the upper part of the body, and self-priming can be achieved after the pump body is filled with clean water.

2. start

The correct direction of rotation of the pump is counterclockwise rotation from the impeller inlet. Once the performance is found to be out of the specified range, immediately stop the inspection and turn to the opposite direction, then change the wiring to correct it.

When checking the steering, disconnect the coupling or pulley and check the motor separately to see if the motor shaft or fan is turning correctly. Open the outlet run, start the pump, indicate from the pressure 

gauge or noise

The sound can judge the self-priming condition. If the self-priming is not completed after 5 minutes, it is necessary to stop the air leak in the inlet pipe. After the self-priming is completed, the small outlet valve is properly closed, and the liquid is slowly filled.

The outlet line, after the outlet line is completely filled, adjust the valve to the rated flow.

3. Give way

There must be no leakage on each mating surface of the pump to ensure that all pipe joints and accessories are tightly fitted to reduce volume loss.

4. temperature

The pump's maximum allowable operating temperature is 80 °C. Long-term shut-off operation will overheat the unit, which will lead to serious consequences. At this time, the cooling should be stopped. To prevent the pump from bursting,

The front cover is equipped with a pressure relief valve, and the pressure relief valve is automatically opened when the pressure inside the pump reaches a certain extreme value. Always check and clean the pressure relief valve with its outlet facing down, after the pressure relief valve is actuated or every time
Repairs must be replaced.

5. Filter

If the filter is installed in the import and export, it should be inspected regularly and cleaned in time. When the pumping liquid flow drops sharply or the pressure gauge reads abnormally, the possibility of the net being blocked should be considered. It is strictly forbidden to use imported
Directional blows with pressurized gas!